We had an issue with that tree again. The engineer and the arborist didn’t agree with the weight and volume on the newly laid driveway slab with drain holes every square metre to feed the tree roots. So back into council we went with a section 961A, with the aim to defer the driveway build until after the build. Council were great. They reviewed carefully and quickly and we have been approved to build the driveway post build.
All documents signed and plans checked, land pegged and bank approval. We anticipate the slab being poured mid October. We are even looking forward to the PortaLoo to arrive! Sad isn’t it. But we know are all about to start then that happens!